• 479-353-2913
Harris United
  • Construction Services
    • Multi-Site Construction
    • Ground-Up Construction
    • In-House Expertise
    • Remodels
    • FF&E Construction
    • Pre-Construction
  • Markets
    • C-Store and Travel Stop
    • QSR
    • Retail
  • Projects
  • About Us
    • Blog
    • Leadership Team
    • Partners
    • Safety
  • Contact
  • Menu Menu

Why Pre-Construction Planning Makes or Breaks a Multi-Site Commercial Build

Pre-construction planning determines whether a commercial build program stays on budget and on schedule or spends the rest of the project recovering from decisions made before the first shovel entered the ground. On a multi-site construction program, those decisions don’t affect one location: they set the conditions every site in the rollout will either benefit from or absorb.

What Gets Skipped in Pre-Construction and What It Costs

The operators who understand commercial preconstruction most clearly are usually the ones who have lived through a build where it was rushed or treated as overhead. The gap isn’t subtle: it shows up in the field with predictable consistency, in the same categories, on nearly every project that started without enough planning.

When pre-construction planning is compressed or deprioritized, the field consequences follow a recognizable pattern:

  • Change Orders Traced to Coordination Failures: When mechanical, electrical, and plumbing scopes aren’t resolved in the drawings before work begins, the conflicts that weren’t caught on paper get caught in the field. Change orders in construction that originate from MEP coordination gaps are the most common and most expensive category of cost overrun on commercial builds, and they are almost entirely preventable.
  • Permit Delays From Incomplete Documentation: Permit reviewers return incomplete packages. Every jurisdiction has specific submission requirements, and a package that doesn’t account for those requirements before submission adds weeks to the critical path.
  • Schedule Compression at the Wrong Stages: When permitting takes longer than planned, the pressure migrates downstream into the construction phases where compressing time has the most consequence: rough-in inspections, trade sequencing, and equipment delivery windows that were never built for compression.
  • Site and Subsurface Conditions Discovered Too Late: Soil conditions, utility capacity, and subsurface constraints are visible in data before excavation begins. Operators who skip a thorough preconstruction review discover these conditions at the moment they’re most expensive to address.

Three Pre-Construction Decisions That Define How a Multi-Site Program Performs

Pre-construction planning covers more ground than most operators expect, and what preconstruction services actually include is wider than a design review. On a multi-site commercial program, three decisions consistently separate programs that deliver on budget from those that absorb the same problems across every location.

These are specific, testable capabilities that any operator evaluating a GC for a national rollout should ask about directly.

Design Coordination and Constructability Review

The first function of pre-construction services is verifying that design documents are complete, coordinated, and actually buildable at the location being planned. Architectural, structural, and MEP drawings have to be reviewed together, not in sequence, because conflicts between disciplines discovered at the drawing stage cost a fraction of what they cost when discovered during active construction.

For multi-site programs, constructability review also means evaluating whether the prototype design translates cleanly to a new geography and site configuration. A prototype developed for one market doesn’t automatically build cleanly in every market. Soil conditions, local utility infrastructure, and jurisdiction-specific code requirements all create translation gaps that a thorough preconstruction review catches before they become field conditions with no clean resolution.

MEP Scope Coordination and Trade Sequencing

Mechanical, electrical, and plumbing systems share the same above-ceiling space on a commercial build, and the sequence in which those systems are installed has to be determined before work begins, not after the first trade has already roughed in. What commercial preconstruction addresses here is the coordination of three disciplines into a single sequenced installation plan that doesn’t require field improvisation to resolve conflicts.

On a multi-site program, MEP coordination that gets resolved in pre-construction on location one becomes the standard the team carries into every location that follows. The inverse is equally true: a MEP conflict resolved in the field on location one, without being captured and corrected in the drawings, will appear again on location two, three, and four.

Permit Strategy and Jurisdiction Planning

Construction project planning in a multi-state rollout requires treating permit strategy as a primary schedule driver, not an administrative task that begins after design is complete. Every jurisdiction in a multi-state program has its own submission requirements, review timelines, and inspection protocols. Operators who learn those requirements during the permitting process, rather than during pre-construction, absorb the cost in schedule time.

A pre-construction planning process that maps jurisdiction requirements before the permit package is assembled can compress the permit timeline by weeks per location. On a ten-location program, that schedule impact is real. On a program where every opening date is tied to a lease or franchise commitment, it translates directly into financial exposure that compounds across the rollout.

Talk to Harris United about what thorough pre-construction planning looks like for your next multi-site program before the first location breaks ground.

Start With Pre-Construction

Why Scale Multiplies Every Pre-Construction Gap

The cost of compressed pre-construction planning on a single commercial build is significant. On a multi-site program, that cost doesn’t multiply: it compounds. The failure mode that appears on location one carries forward in the form of drawings that weren’t updated, coordination assumptions that weren’t corrected, and field habits that weren’t changed.

What makes this especially difficult to see in real time is that the pre-construction decisions creating those problems are made months before the problems surface. By the time a change order appears on location three, its origin in a planning gap on location one is difficult to trace without a GC whose process is built to connect those dots.

Commercial preconstruction that works at the program level isn’t a more thorough version of single-project pre-construction planning. It requires a team that has run multi-site programs before, that understands how pre-construction decisions propagate forward across a rollout, and that treats what they learn on location one as a direct input to the planning process on every location that follows.

The question for operators evaluating a ground-up commercial construction partner isn’t just whether the GC offers pre-construction services. It’s whether the GC’s pre-construction process is built for a program, not a single project.

Build United With Harris United

Harris United brings 25 years of experience running commercial construction programs for operators across Oklahoma, Arkansas, and Texas, and pre-construction planning is where that experience shows up most directly. Our pre-construction process addresses design coordination, MEP scope alignment, constructability review, and permit strategy as integrated disciplines, because those decisions connect to each other in ways that only become visible when something goes wrong in the field.

Every single step of your construction project matters to us, from the first pre-construction meeting through building completion. See what that discipline looks like applied to real programs by reviewing our past projects across Oklahoma, Arkansas, and Texas. If you are running a multi-site program and want a construction partner whose planning process protects your budget and schedule across every location, reach out to Harris United today and let’s talk through what your program requires.

Share This Post

  • Share on Facebook
  • Share on X
  • Share on WhatsApp
  • Share on Pinterest
  • Share on LinkedIn
  • Share on Tumblr
  • Share on Vk
  • Share on Reddit
  • Share by Mail

More Like This

Dunkin Madisonville Int 05

The Commercial Construction Phases: What Every First-Time Developer Needs to Know

Commercial Construction, Ground-Up Construction
https://harrisunited.com/wp-content/uploads/2026/03/Dunkin-Madisonville-Int-05.jpg 1250 2000 Abstrakt Marketing /wp-content/uploads/2026/01/Harris-Logo-COLOR-padding.png Abstrakt Marketing2026-09-09 09:17:312026-09-14 08:52:17The Commercial Construction Phases: What Every First-Time Developer Needs to Know
Side View Of Restaurants In Plaza

Love’s Travel Stops

Miscellaneous
https://harrisunited.com/wp-content/uploads/2021/03/Side-view-of-restaurants-in-plaza.jpg 1250 2000 Abstrakt Marketing /wp-content/uploads/2026/01/Harris-Logo-COLOR-padding.png Abstrakt Marketing2021-03-24 19:35:572026-04-03 10:35:47Love’s Travel Stops

Categories

  • Commercial Construction
  • Ground-Up Construction
  • Miscellaneous
  • Multi-Site Construction
  • Pre-Construction
Harris Logo White

What We Do

Multi-Site Construction

Ground-Up Construction

In-House Trade Expertise

Remodels

FF&E Construction

Pre-Construction

Markets

C-Store and Travel Stop

QSR

Retail

Contact Us

PO Box 240
Jenks, OK 74037

479-353-2913

[email protected]

Website by Abstrakt Marketing Group ©
  • Privacy Policy
  • Sitemap
  • Linkedin
Scroll to top Scroll to top Scroll to top

This site uses cookies. By continuing to browse the site, you are agreeing to our use of cookies.

AcceptLearn more

Cookie and Privacy Settings



How we use cookies

We may request cookies to be set on your device. We use cookies to let us know when you visit our websites, how you interact with us, to enrich your user experience, and to customize your relationship with our website.

Click on the different category headings to find out more. You can also change some of your preferences. Note that blocking some types of cookies may impact your experience on our websites and the services we are able to offer.

Essential Website Cookies

These cookies are strictly necessary to provide you with services available through our website and to use some of its features.

Because these cookies are strictly necessary to deliver the website, refusing them will have impact how our site functions. You always can block or delete cookies by changing your browser settings and force blocking all cookies on this website. But this will always prompt you to accept/refuse cookies when revisiting our site.

We fully respect if you want to refuse cookies but to avoid asking you again and again kindly allow us to store a cookie for that. You are free to opt out any time or opt in for other cookies to get a better experience. If you refuse cookies we will remove all set cookies in our domain.

We provide you with a list of stored cookies on your computer in our domain so you can check what we stored. Due to security reasons we are not able to show or modify cookies from other domains. You can check these in your browser security settings.

Other external services

We also use different external services like Google Webfonts, Google Maps, and external Video providers. Since these providers may collect personal data like your IP address we allow you to block them here. Please be aware that this might heavily reduce the functionality and appearance of our site. Changes will take effect once you reload the page.

Google Webfont Settings:

Google Map Settings:

Google reCaptcha Settings:

Vimeo and Youtube video embeds:

Accept settingsHide notification only
X

Firstname Lastname

Faucibus semper placerat class penatibus neque auctor accumsan, posuere suscipit nam lobortis orci blandit litora dictumst, a dignissim eget potenti consequat purus. Ante facilisi montes nisi eros est eleifend venenatis litora donec magnis tortor, curabitur iaculis rutrum malesuada viverra fringilla blandit sem ligula nam, egestas rhoncus fames dictumst ultrices conubia nisl pharetra varius nascetur.
X

Chrissey Harris

Founder

Chrissey Harris has been working in the construction industry for over 25 years. Her background and education in accounting made her an immediate asset. In 2005 she started a construction company which she built up and owned for several years before successfully selling the company in 2008. She has worked in the specialties of earthwork, utilities, and concrete as well as general contracting. In early 2017 Chrissey made the decision to pioneer a women owned construction business. With the help of her two daughters she founded Harris United, llc. She often says, “We want to keep safety, environmental responsibility, and customer satisfaction at the forefront of every move we make.” She believes that a team work attitude is one of the keys to success.
X

Jamie Brown

VP of Operations

Jamie is a project and operations professional with deep experience executing complex builds and turning vision into finished, profitable results. He works best alongside driven owners and leadership teams who value clear thinking, accountability, and momentum. His edge is simple: seeing what needs to happen next and making it happen.
X

Jett Harris

Sr. Project Manager

A graduate of Oklahoma State University, Jett received his B.S. in construction management in 1996.
X

Donny Ratliff

Chief Estimator

Donny started off in the field of surveying 15 years ago before moving into construction for the last 10+ years. Since making the move into project management, he is now the Chief Estimator and Head of Preconstruction for Harris United. Donny has been a part of the completion of over 100 Love's Travel Stops, among other projects.
X

Alanna Harris

HR & Payroll Director

Alanna is a graduate of Oklahoma State University, where she earned three degrees and built the foundation for her career. For the past 10 years, she has worked alongside her family in the construction industry, gaining hands-on experience and a strong appreciation for the work they do. Being part of a family-run business has shaped her values and approach, with a focus on consistency, attention to detail, and doing things the right way. Outside of work, she enjoys spending time with her four Rottweilers.
X

Adel Morris

Project Manager

Adel began working as a project manager over 10 years ago. She worked with the national brand Middleby Corporation, including Fortune 500 brands as well as private companies such as Tropical Smoothie, Dunkin Donuts, Subway, and Darden Corporation. Adel has been a part of the completion of over 100 Love's Travel Stores, RV parks, tire service stations, truck washes, amongst other projects.
X

Oliver Davenport

Chief Pilot & Transportation Specialist Nebraska native. Has worked in the professional transportation industry for 8 years.
X

Tricia Baca

Controller

Tricia graduated from Langston University, receiving her BBA in Accounting. She has over 35 years experience including accounts payable, accounts receivable, employee accounting, payroll, asset accounting and regulatory accounting.
X

Matthew Weickgenant

Logistics/Warehouse Manager

Truck Driver 40 years Construction field 40 years
X

Renee Lopez

Concrete Superintendent

Renee brings over 20 years of construction experience as a concrete specialist to the team.
X

Kenneth Dever

Superintendent

Superintendent 5 years
X

Kevin English

Superintendent

Kevin has seven years of experience with Harris United, building Love’s Travel stops as well as truck care centers. He has been in commercial construction for twenty-eight years with a variety of builds and personal hands-on experience.
X

Deb Gomez

Director of Construction Finance & Accounting

Deb brings 30+ years of career experience to Harris United, ranging from manufacturing to energy sectors. She has a B.S. in Accounting and has developed strong skills in budgeting, accounting, internal controls, financial reporting, analysis and modeling and treasury management. She believes in delivering quality results that are both timely and accurate while operating in a team-oriented environment.
X

Mark Thompson

Superintendent

Mark is well versed in industry standards as well as construction processes in commercial and residential construction sectors. He has overseen the execution of complex and diverse projects, such as restaurant and retail remodels, office and tenant improvements, as well as residential and commercial ground ups. He is passionate about creating value for clients and stakeholders and advancing the growth and innovation of the company. He is always eager to learn new skills and technologies and to collaborate with talented and driven professionals. He is also a proud graduate of the University of Massachusetts/Amherst and the even prouder father of 21 year-old twin daughters.
X

John Arenz

Superintendent

John is an army veteran with 45 years of experience in petro chemical, industrial, and commercial construction projects.
X

Fred Ndimgwango

Pilot

Fred is a graduate of Oklahoma State University, receiving his B.S. in Mechanical Engineering and his M.S. in Aviation and Space. He has worked in the transportation industry for four years.
X

Richard Reeder

Assistant Project Manager & Warranty Administrator

Richard has over a decade of experience in the construction industry, beginning his work in the field as a teenager and building a strong foundation across multiple aspects of the trade. He previously owned and operated a property management company before joining Harris United, where he currently manages all warranty issues and serves as Assistant Project Manager.
X

Jupiter "JuJu"

Chief Morale Officer (CMO) Jupiter (“Juju” to his coworkers) joined the company four years ago after being adopted from Skiatook Paws & Claws Animal Rescue and has basically been running the place ever since. He comes to work every day ready to greet visitors, supervise meetings he wasn’t invited to, and remind employees to take snack breaks. While his work ethic becomes questionable after 2 PM, his office morale contributions are unmatched. When he’s not busy overseeing the office or occasionally barking during important phone calls, he can usually be found napping under his mom's desk.